行業(yè)標(biāo)準(zhǔn)
CJJ-T306-2020······1
1 總則······13
2 術(shù)語······14
3 基本規(guī)定······16
4 規(guī)劃與總平面布置······18
4.1 規(guī)劃選址······18
4.2 功能與規(guī)模······19
4.3 總平面布置······22
4.4 站場與線路······25
4.5 全自動運(yùn)行模式下的車輛基地······31
4.6 綜合管線······32
5 運(yùn)用設(shè)施······34
5.1 一般規(guī)定······34
5.2 停車列檢庫······35
5.3 周月檢庫······43
5.4 洗車庫······48
5.5 在線綜合檢測設(shè)施······50
6 檢修設(shè)施······52
6.1 一般規(guī)定······52
6.2 大架修庫······54
6.3 定修庫、臨修庫······59
6.4 不落輪鏇輪庫······63
6.5 吹掃庫······64
6.6 靜調(diào)庫······65
6.7 試車線······66
6.8 調(diào)機(jī)庫和工程車庫······68
7 綜合維修與救援······70
7.1 綜合維修中心······70
7.2 物資總庫······72
7.3 救援設(shè)施······74
8 配套設(shè)施······76
8.1 房建設(shè)施······76
8.2 培訓(xùn)中心······80
8.3 通風(fēng)、空調(diào)與供暖······80
8.4 給水與排水······81
8.5 動力配電與照明······82
8.6 其他生產(chǎn)、生活設(shè)施······86
9 相關(guān)系統(tǒng)······90
9.1 牽引供電······90
9.2 通信······92
9.3 信號······92
9.4 自動化······95
10 環(huán)保與節(jié)能······96
10.1 環(huán)境保護(hù)······96
10.2 節(jié)約能源······96
10.3 防災(zāi)與安防······97
11 設(shè)備安裝及試運(yùn)轉(zhuǎn)······99
11.1 一般規(guī)定······99
11.2 設(shè)備布局······99
11.3 設(shè)備安裝前工作要求······100
11.4 設(shè)備安裝······100
11.5 設(shè)備試運(yùn)轉(zhuǎn)······101
12 工程驗收······104
12.1 一般規(guī)定······104
12.2 工程驗收劃分······105
12.3 工程驗收條件······106
本標(biāo)準(zhǔn)用詞說明······109
引用標(biāo)準(zhǔn)名錄······110
附:條文說明······112
1 總則······116
2 術(shù)語······117
3 基本規(guī)定······118
4 規(guī)劃與總平面布置······121
4.1 規(guī)劃選址······121
4.2 功能與規(guī)模······122
4.3 總平面布置······123
4.4 站場與線路······124
4.5 全自動運(yùn)行模式下的車輛基地······124
4.6 綜合管線······125
5 運(yùn)用設(shè)施······126
5.1 一般規(guī)定······126
5.2 停車列檢庫······126
5.3 周月檢庫······129
5.4 洗車庫······130
6 檢修設(shè)施······131
6.1 一般規(guī)定······131
6.2 大架修庫······131
6.3 定修庫、臨修庫······132
6.4 不落輪鏇輪庫······132
6.5 吹掃庫······132
6.6 靜調(diào)庫······133
6.7 試車線······133
7 綜合維修與救援······134
7.1 綜合維修中心······134
8 配套設(shè)施······136
8.1 房建設(shè)施······136
8.6 其他生產(chǎn)、生活設(shè)施······137
11 設(shè)備安裝及試運(yùn)轉(zhuǎn)······138
11.1 一般規(guī)定······138
11.2 設(shè)備布局······139
11.3 設(shè)備安裝前工作要求······139
11.4 設(shè)備安裝······140
11.5 設(shè)備試運(yùn)轉(zhuǎn)······140
12 工程驗收······142
12.1 一般規(guī)定······142
12.2 工程驗收劃分······142
12.3 工程驗收條件······142
下載地址
同類標(biāo)準(zhǔn)
JGJ203-2010:民用建筑太陽能光伏系統(tǒng)應(yīng)用技術(shù)規(guī)范
時間:2023-04-03 19:32:16JGJ134-2010:夏熱冬冷地區(qū)居住建筑節(jié)能設(shè)計標(biāo)準(zhǔn)
時間:2023-04-03 19:22:46JGJ475-2019:溫和地區(qū)居住建筑節(jié)能設(shè)計標(biāo)準(zhǔn)
時間:2023-04-03 19:32:49JGJ26-2018:嚴(yán)寒和寒冷地區(qū)居住建筑節(jié)能設(shè)計標(biāo)準(zhǔn)
時間:2023-04-03 19:29:32JGJ/T229-2010:民用建筑綠色設(shè)計規(guī)范
時間:2023-04-03 19:26:56JGJ75-2012:夏熱冬暖地區(qū)居住建筑節(jié)能設(shè)計標(biāo)準(zhǔn)
時間:2023-04-03 19:27:46