國家標(biāo)準(zhǔn)
GBT51310-2018······1
1 總則······24
2 術(shù)語······25
3 基本規(guī)定······27
4 施工準(zhǔn)備······30
4.1 一般規(guī)定······30
4.2 前期調(diào)查與專項工作······30
4.3 技術(shù)······31
4.4 施工現(xiàn)場······31
4.5 施工機械······32
4.6 材料······32
4.7 勞動力······32
5 安全風(fēng)險控制······33
5.1 一般規(guī)定······33
5.2 施工準(zhǔn)備階段安全風(fēng)險評估······33
5.3 施工過程安全風(fēng)險控制······33
5.4 安全風(fēng)險控制文件編制······35
6 施工測量······36
6.1 一般規(guī)定······36
6.2 控制測量······36
6.3 聯(lián)系測量······37
6.4 明挖法施工測量······40
6.5 蓋挖法施工測量······40
6.6 礦山法施工測量······41
6.7 盾構(gòu)法施工測量······42
6.8 高架結(jié)構(gòu)、地面線施工測量······44
6.9 車輛基地施工測量······46
6.10 貫通測量······47
6.11 隧道斷面測量······47
6.12 鋪軌測量······48
6.13 設(shè)備安裝測量······51
6.14 竣工測量······51
7 地下水控制······53
7.1 一般規(guī)定······53
7.2 地下水控制方法的選擇······54
7.3 管井······58
7.4 輕型井點······60
7.5 回灌井······61
7.6 隔水帷幕······61
7.7 滲井······62
7.8 集水明排······62
7.9 排水管線及檢查井······63
7.10 降水管理······63
7.11 降水監(jiān)測······65
8 明挖法······68
8.1 一般規(guī)定······68
8.2 管線懸吊與改移······69
8.3 交通導(dǎo)改與基坑便橋······70
8.4 基坑圍(支)護(hù)結(jié)構(gòu)······70
8.5 基坑開挖與回填······90
8.6 鋼筋工程······93
8.7 模板與支架······97
8.8 混凝土澆筑······99
8.9 內(nèi)部結(jié)構(gòu)施工······102
9 蓋挖法······103
9.1 一般規(guī)定······103
9.2 圍護(hù)結(jié)構(gòu)及支承柱······104
9.3 鋪蓋體系······106
9.4 土方開挖······109
9.5 主體結(jié)構(gòu)······110
10 礦山法······111
10.1 一般規(guī)定······111
10.2 豎井······111
10.3 地層超前支護(hù)及加固······112
10.4 開挖······115
10.5 隧道內(nèi)運輸······121
10.6 初期支護(hù)······123
10.7 洞內(nèi)排水······128
10.8 二次襯砌······129
10.9 風(fēng)、水、電臨時設(shè)施及通風(fēng)防塵······132
11 盾構(gòu)法······135
11.1 一般規(guī)定······135
11.2 盾構(gòu)工作井······135
11.3 盾構(gòu)組裝與解體······136
11.4 盾構(gòu)始發(fā)和接收······136
11.5 盾構(gòu)掘進(jìn)······137
11.6 特殊地段掘進(jìn)······140
11.7 管片拼裝······141
11.8 壁后注漿······141
11.9 隧道內(nèi)運輸、通風(fēng)、照明、給水······142
12 沉管法······143
12.1 一般規(guī)定······143
12.2 干塢施工及岸上段隧道······144
12.3 隧道基槽開挖、墊層與回填施工······145
12.4 管節(jié)預(yù)制······148
12.5 管節(jié)舶裝······149
12.6 管節(jié)浮運和沉放······151
12.7 管節(jié)接頭處理······153
13 監(jiān)控量測······155
13.1 一般規(guī)定······155
13.2 監(jiān)測項目與監(jiān)測點布設(shè)······155
13.3 監(jiān)測頻率······161
13.4 監(jiān)測數(shù)據(jù)處理及成果反饋······164
14 路基······165
14.1 一般規(guī)定······165
14.2 路重······166
14.3 路堤······167
14.4 涵洞······170
15 高架結(jié)構(gòu)······172
15.1 一般規(guī)定······172
15.2 基礎(chǔ)······172
15.3 下部結(jié)構(gòu)······174
15.4 支架現(xiàn)澆混凝土······175
15.5 預(yù)制梁······178
15.6 預(yù)應(yīng)力混凝土結(jié)構(gòu)······179
15.7 鋼梁······184
15.8 橋面系及附屬工程······185
15.9 高架車站結(jié)構(gòu)······186
16 防水······187
16.1 一般規(guī)定······187
16.2 防水混凝土······187
16.3 明挖法······192
16.4 蓋挖法······198
16.5 礦山法······199
16.6 盾構(gòu)法······201
16.7 沉管法······202
16.8 特殊部位防水······203
16.9 高架結(jié)構(gòu)······209
17 建筑裝飾裝修······211
17.1 一般規(guī)定······211
17.2 涂飾工程······212
17.3 吊頂······212
17.4 墻面及柱面······214
17.5 地面······214
17.6 欄桿及扶手······215
17.7 金屬門窗······216
17.8 標(biāo)志······216
18 軌道······217
18.1 一般規(guī)定······217
18.2 器材整備、堆放和運輸······219
18.3 基標(biāo)設(shè)置······219
18.4 普通無昨道床······220
18.5 減振無昨道床······221
18.6 有碎道床······224
18.7 道岔及鋼軌伸縮調(diào)節(jié)器鋪設(shè)······225
18.8 無縫線路軌道······227
18.9 有縫線路軌道······228
18.10 軌道安全設(shè)備及附屬設(shè)備······230
19 站內(nèi)客運設(shè)備······232
19.1 一般規(guī)定······232
19.2 自動扶梯和自動人行道安裝······232
19.3 電梯安裝······236
19.4 輪椅升降機安裝······239
19.5 調(diào)整試驗······240
20 站臺屏蔽門······243
20.1 一般規(guī)定······243
20.2 結(jié)構(gòu)及設(shè)備安裝······243
20.3 接地及布線······245
20.4 調(diào)整試驗······246
21 通風(fēng)與空調(diào)······248
21.1 一般規(guī)定······248
21.2 風(fēng)管及部件制作······248
21.3 風(fēng)管及部件安裝······254
21.4 空調(diào)水系統(tǒng)······257
21.5 設(shè)備安裝······259
21.6 防腐與絕熱······261
21.7 調(diào)整試驗······261
22 給水與排水······264
22.1 一般規(guī)定······264
22.2 給水管道安裝······265
22.3 排水管道安裝······267
22.4 設(shè)備安裝······268
22.5 接地與雜散電流······269
22.6 調(diào)整試驗······269
23 供電······272
23.1 一般規(guī)定······272
23.2 變電所······273
23.3 牽引網(wǎng)······277
23.4 電纜線路······285
23.5 防雷及接地裝置······287
23.6 雜散電流監(jiān)測及防護(hù)······289
23.7 電力監(jiān)控與電能質(zhì)量管理······290
23.8 低壓配電及動力照明······291
23.9 調(diào)整試驗······300
23.10 系統(tǒng)調(diào)試······304
24 通信······308
24.1 一般規(guī)定······308
24.2 通信線路······308
24.3 通信設(shè)備安裝······314
24.4 系統(tǒng)調(diào)試······317
25 信號······323
25.1 一般規(guī)定······323
25.2 光(電)纜線路······323
25.3 設(shè)備安裝······326
25.4 防雷與接地······335
25.5 系統(tǒng)調(diào)試······337
26 火災(zāi)自動報警系統(tǒng)······341
26.1 一般規(guī)定······341
26.2 光(電)纜線路······341
26.3 設(shè)備安裝及配線······342
26.4 調(diào)整試驗······343
27 環(huán)境與設(shè)備監(jiān)控系統(tǒng)······347
27.1 一般規(guī)定······347
27.2 設(shè)備安裝及配線······347
27.3 調(diào)整試驗······348
28 綜合監(jiān)控系統(tǒng)······350
28.1 一般規(guī)定······350
28.2 設(shè)備安裝及配線······350
28.3 系統(tǒng)調(diào)試······352
29 乘客信息系統(tǒng)······359
29.1 一般規(guī)定······359
29.2 設(shè)備安裝及布線······359
29.3 系統(tǒng)調(diào)試······360
30 自動售檢票系統(tǒng)······362
30.1 一般規(guī)定······362
30.2 光(電)纜線路······362
30.3 設(shè)備安裝與布線······363
30.4 系統(tǒng)調(diào)試······364
31 門禁系統(tǒng)······366
31.1 一般規(guī)定······366
31.2 設(shè)備安裝與布線······366
31.3 調(diào)整試驗······367
32 車輛基地······370
32.1 一般規(guī)定······370
32.2 檢查坑、檢修平臺和卸車平臺······370
32.3 工藝設(shè)備安裝······371
33 綜合聯(lián)調(diào)與試運行······375
33.1 一般規(guī)定······375
33.2 關(guān)聯(lián)系統(tǒng)調(diào)試······381
33.3 系統(tǒng)總聯(lián)調(diào)······388
33.4 試運行······389
本標(biāo)準(zhǔn)用詞說明······393
引用標(biāo)準(zhǔn)名錄······394
下載地址
同類標(biāo)準(zhǔn)
GB/T51147-2015:硝胺類廢水處理設(shè)施技術(shù)規(guī)范
時間:2024-02-25 20:13:53GB/T51241-2017:管道外防腐補口技術(shù)規(guī)范
時間:2024-02-25 20:13:27GB/T51264-2017:雙向拉伸薄膜工廠設(shè)計標(biāo)準(zhǔn)
時間:2024-02-25 20:12:15GB/T51259-2017:腈綸設(shè)備工程安裝與質(zhì)量驗收規(guī)范
時間:2024-02-25 20:13:02GB51237-2017:火工品試驗室工程技術(shù)規(guī)范
時間:2024-02-25 20:12:37GB50488-2018:腈綸工廠設(shè)計標(biāo)準(zhǔn)
時間:2024-02-25 20:11:48